Weekly Road Construction Report

Thursday, December 14, 2017

Here is the weekly road construction report for Hamilton County:

I-24 East bridge repair over Chestnut Street at mile marker 178.6 near the U.S. 27 interchange and safety improvements on the bridges over the CSX Railroad and over U.S. 27:  Work on this project is completed pending final inspection.  Estimated project completion date is December.  [Dement Construction Co., LLC/Pruett/CNR031] 

U.S. 27 (I-124) widening from I-24/U.S. 27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge:  Work on this project continues.  The contractor has closed the 12th Street tie-in ramp to U.S. 27 South.  This closure will be in place until April 2018.  Traffic from 12th Street will be detoured to Carter Street and then to Westbound MLK where motorists may access the U.S. 27 South on-ramp.  Detours are posted.  Motorists should exercise caution when traveling through the construction zone and pay close attention to the detour signage posted.  The speed limit on U.S. 27 in the construction zone is 45 MPH.  Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7PM and 6AM.  At least one lane will remain open in each direction on U.S. 27.  THP will assist with traffic control on the project as necessary.  Estimated project completion date is July 2019.  [Dement Construction Co., LLC/JM/CNP230] 

SR-320 (East Brainerd Road) grading, drainage, installation of signals, construction of seven retaining walls and paving from east of Graysville Road to east of Bel-Air Road:  Work on this project continues.  During this report period, the contractor may have intermittent lane closures between 9AM-2PM.  This work may affect either direction of East Brainerd Road or side streets from Graysville Road to Bel-Air Road.  Because the contractor needs to access the left side of the road to work on the next phase of the project, he recently performed a traffic shift on East Brainerd Road from Fuller Road to end of project past Banks Road.  Traffic is currently traveling on the newly-paved section from Fuller Road to the end of project.  Banks Road traffic will access the new section by traveling West on the existing pavement and entering the new section of roadway at Everett Drive.  The contractor will be closing Banks Road at East Brainerd Road from Wednesday, December 20, 2017 to Friday, December 22, 2017 for water line installation.  Detour signage will be posted routing traffic down Morris Hill Road to Igou Gap to Banks and vice versa.  Changeable messages signs will be posted to alert traffic of the closure starting on Monday, December 18, 2017. There will also be signage marking the access point for the four businesses that are located on East Brainerd Road near Banks Road.  The road will be reopened prior to 8:00 PM on Friday, December 22, 2017 per the TDOT 2017 holiday lane closure restrictions.  Flaggers will assist with traffic control as needed.  Estimated project completion date is June 2018. [Jones Brothers Contractors, LLC /Pruett/CNN383] 

SR-153/SR-319 (Hixson Pike) bridge repair on Hixson Pike over SR-153:  Work on this project continues.  Work on this project is substantially complete and all lanes are open to traffic.  If there are any lane closures needed to finish up the project, they will be temporary and not happen until next year after the holidays.  Estimated project completion date is May 2018. [Mid-State Construction Co. /Micka/CNQ941] 

U.S. 11 (SR-2/Brainerd Road) resurfacing from McCallie Tunnel (LM 11.83) to east of Moore Rd. (LM 13.85):  Work on this project is complete pending final inspection.  Estimated project completion date is December. [Talley Construction/Pruett/CNR218] 

The tunnel cleaning of the McCallie Tunnel on U.S. 11 (US 64, SR-2), the Stringers Ridge Tunnel on U.S. 127 (SR-8), and the Bachman Tubes on U.S. 41 (U.S. 76, SR-8):  The nighttime cleaning operation of McCallie Tunnels, Stringers Ridge Tunnel, and Bachman Tubes occurs between 8PM-6AM.  Tunnels will be closed during cleaning, and detours will be marked accordingly as each tunnel is cleaned.  Contract completion date is June 2018.  [ETI Environmental, Inc./Micka/CNR223]
 



Martin Luther King, Jr. Tribute On Tuesday At UTC Postponed, Due To Inclement Weather

" O, King: A Tribute to the Legacy of Dr. Martin Luther King Jr.," scheduled for  7:30 p.m. on  Tuesday,  in UTC's Roland Hayes Concert Hall, has been postponed due to the threat of snow and icy conditions. It will be rescheduled. (click for more)

Ochs Highway Closed In St. Elmo Due To Water Main Break

Ochs Highway is closed at the intersection of Saint Elmo Avenue due to a main water break.   The road is scheduled to reopen on  Thursday . Detours are set up using Alabama Avenue and West 41st Street.  In order to view a map of these  closures , visit  http://www.chattanooga. gov/transportation/ traffic ... (click for more)

Snow Reaches Chattanooga on Tuesday Afternoon, But Brings Little Accumulation; Many Schools Closed Wednesday

Snow began falling in downtown Chattanooga early Tuesday afternoon, but there was little accumulation.  Less than an inch of snow was predicted, but a number of schools, courts and events were cancelled on Tuesday. Hamilton County Schools will be closed  on Wednesday  "due to the snowfall in the area this afternoon and dangerous secondary roads reported across ... (click for more)

Young Gets 23 Years In North Chattanooga Murder

Abram "AB" Young pleaded guilty on Tuesday morning to a murder in North Chattanooga and was sentenced to 23 years in prison. Young was 17 at the time of the 2015 slaying of 19-year-old Charles Holsey during a drug deal behind the Kangaroo on Dallas Road. He is now 20. Prosecutor Cameron Williams said the sentence for second-degree murder will be served at 100 percent. Young ... (click for more)

Thank You, Dr. Martin Luther King, Jr.

Thank you, Dr. King for stepping-out.  Thank you for your lasting voice to what it's all about. Thank you, Dr. King for  stepping up and also showing-up, ...when decisions were being made and  your refusal  to shut-up.  We find your fingerprints on both directions and toward progress.  your modeling, mentoring,  and reactions helps ... (click for more)

Roy Exum: Vulgar Trump & More

Nothing rankles me more than seeing obscenities and vulgarity that appears in today’s liberal media, not to dare mention our public forum. Understand, I will use “damn” when no other word will fit as well. I’ll use “hell” as an exclamation point sometimes and I also may quote an aggressor in a story where he threatens to whip another’s “ass.” But our President reached an all-time ... (click for more)