I-75 North Exit 1 interchange reconfiguration project at mile marker 1: Work on this project continues. The project will result in a reconfiguration of the exit ramps and will combine both northbound exits (1A & 1B) into one, which will allow drivers to turn both east and west on Ringgold Road at a signalized intersection. Traffic has been shifted onto the newly constructed portion of Camp Jordan Pkwy., and the intersection (I-75 NB off-ramp and SR-8/Camp Jordan Pkwy.) is now controlled by a new traffic signal.  Estimated project completion date is May.
[C.W. Matthews Contracting/City Of East Ridge/LCLPRGM]  

U.S. 27 (I-124) widening from I-24/U.S. 27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues. Weather permitting on Thursday the contractor will implement a temporary nighttime right lane closure on US-27 North from I-24 to the Olgiati Bridge, from 7 p.m.-6 a.m. During this time, the US-27 North off-ramp (Exit 1C) to 4th Street will be temporarily closed.  Traffic will be detoured using the US-27 North off-ramp (Exit 1B) to MLK Boulevard and then to Broad Street. Also, the West MLK Boulevard on-ramp to US-27 North will be temporarily closed, and traffic will be detoured using Chestnut Street to the 4th Street on-ramp to US-27 North. These changes will affect the on-ramp to US-27 North from MLK Boulevard, and the off-ramp (Exit 1C) from US 27 North to 4th Street. Traffic coming from downtown Chattanooga and using the on-ramp to US-27 North from MLK Boulevard will be required to come to a complete stop at the top of the ramp and will have a limited acceleration lane to merge on to the highway. Traffic wishing to access 4th Street at Exit 1C from US-27 North will now be directed to a new temporary exit ramp after crossing the 6th Street overpass. This new temporary exit ramp will be narrow and posted for 15 MPH. This new traffic pattern will be in place until this fall. Motorists are encouraged to seek alternate routes due to the increased congestion between MLK Boulevard and 4th Street. The speed limit will continue to be posted for 35 MPH between Main Street and 4th Street on US 27 North. The speed limit on US 27 in the rest of the construction zone will remain 45 MPH. Motorists should exercise caution when traveling through the construction zone and pay close attention to the signage posted. 
On Wednesday the contractor will implement a nighttime temporary left lane closure on Northbound US27 from I-24 to the Main Street overpass, from 7 p.m.-6 a.m., for setting bridge beams.
The contractor has closed the 12th Street tie-in ramp to U.S. 27 South. This closure will be in place until April. Traffic from 12th Street will be detoured to Carter Street and then to Westbound MLK where motorists may access the U.S. 27 South on-ramp. Detours are posted. Motorists should exercise caution when traveling through the construction zone and pay close attention to the detour signage posted. 
Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 p.m.-6 a.m. At least one lane will remain open in each direction on U.S. 27. THP will assist with traffic control on the project as necessary. Restrictions: I 124 (US-27) Northbound Exit 1C 4th Street Off Ramp. No oversize/over-dimensional loads. Width Limit is 11 feet. Estimated project completion date is January 2020.
[Dement Construction Company, LLC/Micka/CNP230]  

SR-320 (East Brainerd Road) grading, drainage, installation of signals, construction of seven retaining walls and paving from east of Graysville Road to east of Bel-Air Road: During this report period, the contractor will have intermittent lane closures between 9 a.m.-2 p.m. This work may affect either direction of East Brainerd Road or side streets from Graysville Road to Bel-Air Road. Flaggers will assist with traffic control as needed.  Estimated project completion date is June.
[Jones Bros. Contractors, LLC/Pruett/CNN383]  

The tunnel cleaning of the McCallie Tunnel on U.S. 11 (US 64, SR-2), the Stringers Ridge Tunnel on U.S. 127 (SR-8), and the Bachman Tubes on U.S. 41 (U.S. 76, SR-8): The nighttime cleaning operation of McCallie Tunnels, Stringers Ridge Tunnel, and Bachman Tubes occurs between 8 p.m.-6 a.m.. Tunnels will be closed during cleaning, and detours will be marked accordingly as each tunnel is cleaned. Estimated project completion date is June.
[ETI Environmental, Inc./Micka/CNR223]  


HCSO Detective Graduates Prestigious National Forensic Academy

Sheriff Jim Hammond announced Hamilton County Sheriff’s Office Detective Shane Forgey ahs graduated from the UT Law Enforcement Innovation Center – Institute for Public Services’ National Forensic Academy in Oak Ridge.  The National Forensic Academy is an intensive 10-week training program co-funded by the Bureau of Justice Assistance, designed to meet the demanding needs ... (click for more)

Hood’s Texas Brigade At The Battle Of Chickamauga Program Is April 14

Chickamauga and Chattanooga National Military Park will provide a special 90-minute driving/walking tour on Saturday, April 14, at 2 p.m., following General John B. Hood’s famous Texas Brigade. This tour begins at the Chickamauga Battlefield Visitor Center.    Hood’s Texas Brigade is one of the more storied units of the American Civil War. During Chickamauga, its soldiers ... (click for more)

Signal Mountain Council Debating Future Of Mountain Center; Vice Mayor Gee Goes Off Council After Marrying And Moving Out Of Town Limits

A discussion regarding the Mountain Arts Community Center lease and memorandum of agreement with a non- profit organization that has been formed with a proposed to manage it took place at the Signal Mountain town council meeting Friday afternoon. City Manager Boyd Veal had created a document for the purpose of starting a discussion and to identify how the council would like to move ... (click for more)

Students OK After Bag Containing Meth Found At Nolan Elementary

Officials say students at Nolan Elementary School on Signal Mountain are okay after discovering a bag that contained meth. The incident happened on Friday afternoon during a reading fair.  Principal Dr. Shane Harwood sent this message to parents: "Good Afternoon Nolan Families - We wanted to share some information related to an event that has taken ... (click for more)

Food Trucks Steal From Property And Rent-Paying Eateries - And Response

According to minutes of the City Council’s  Economic Development Committee and several local news articles, Chattanooga’s City Attorney gave a food truck presentation. He explained to City Council that a new food truck ordinance was being drafted to allow use of mobile food trucks on public  property . He said Chattanooga’s current ordinance limited food trucks to parking ... (click for more)

Roy Exum: The Saturday Funnies

I don’t make much of a secret that I hated every single second of the short time I spent in college or that I never took a journalism class. Instead what I know about writing was taught by a far greater collection of experts than you can find on any college campus. Andy Rooney, for example, was a genius with a dry humor who lectured to me almost every Sunday night for about 30 years. ... (click for more)